New production hall gleams in steel from Montana Building Systems Ltd.
A change of location led to the perfect infrastructure for Hunkeler + Hediger Metallbau AG. Montana Bausysteme AG was also involved in the construction of the new production hall in Schöftland.
Because the landlord Implenia needed its building itself, Hunkeler + Hediger Metallbau AG moved from Oberentfelden in Aargau to Schöftland in October 2020. This was a good opportunity for the 25 employees of the company founded in 1984 for high-quality metal construction solutions in aluminium, steel and chrome steel: the bright hall of around 1600 square metres offers the perfect infrastructure for production and - on the upper floor - ten modern offices. Cinema 8 has meanwhile moved into the basement.
Montana Building Systems Ltd. was also involved in the construction, and quite prominently so. With MONTANATHERM® MTD TL 185 for the 1,400 square metre roof, 300 square metres of SWISS PANEL® SP 40 with anti-drumming fleece for the arcade and for a total façade area of 1,300 square metres - all in the colour HELIOS in steel, coating Colorcoat PRISMA®.
Owner: Walter Häfeli Immobilien AG, Aarau
Architect: Architekten Gemeinschaft 4 AG, Aarau
Construction management: as zwöi gmbh, Schöftland