Photovoltaic plant in operation
Time to act! The installation and commissioning of the PV system is an important step for us on our way to becoming CO2-neutral by 2030.
1,574 modules provide for a planned annual electricity production of 671,490 kWh, which corresponds to around 663 people or 166 households.
A total of three expansion stages are possible. The second stage is planned for autumn 2023 in conjunction with a heat pump to heat all the buildings.